To read this content please select one of the options below:

‘Leaving the contractor much freer to organise himself’

P. CORNER (DIRECTOR OF DEFENCE QUALITY ASSURANCE (TECHNICAL))

Aircraft Engineering and Aerospace Technology

ISSN: 0002-2667

Article publication date: 1 May 1973

42

Abstract

“WE NOW INTEND to define the end result in a considerable amount of detail and leave the contractor much freer to organise himself as best suits his particular product and the environment in which he works.”

Citation

CORNER, P. (1973), "‘Leaving the contractor much freer to organise himself’", Aircraft Engineering and Aerospace Technology, Vol. 45 No. 5, pp. 30-31. https://doi.org/10.1108/eb035023

Publisher

:

MCB UP Ltd

Copyright © 1973, MCB UP Limited

Related articles