Yamazaki Multi‐Pallet Machining Centre Reduces Lead Time by 75 Per cent

Aircraft Engineering and Aerospace Technology

ISSN: 0002-2667

Article publication date: 1 May 1986

28

Abstract

A Yamazaki H22 power centre has reduced overall lead time for the production of certain aero engine components from 20–24 weeks using conventional methods, to just six weeks.

Citation

(1986), "Yamazaki Multi‐Pallet Machining Centre Reduces Lead Time by 75 Per cent", Aircraft Engineering and Aerospace Technology, Vol. 58 No. 5, pp. 12-13. https://doi.org/10.1108/eb036280