Bristol pilot into home seller's information packs

Structural Survey

ISSN: 0263-080X

Article publication date: 1 October 2000

97

Keywords

Citation

(2000), "Bristol pilot into home seller's information packs", Structural Survey, Vol. 18 No. 4. https://doi.org/10.1108/ss.2000.11018dab.008

Publisher

:

Emerald Group Publishing Limited

Copyright © 2000, MCB UP Limited


Bristol pilot into home seller's information packs

Bristol pilot into home seller's information packs

Keywords Home-selling, Information pack, Pilot study

Early indications from DETR are that the Bristol-based pilot study into the proposed changes in home selling is going well. Exchange of contracts has been reached on five properties with time taken from the acceptance of an offer ranging from eight days to 32 days. This compares with 62 days taken to get to exchange on a typical sale nationally. Six surveying firms are involved in the pilot, providing the home condition reports which form part of the information packs.

Related articles