Industrial Robot: Volume 21 Issue 4

Strapline:

The international journal of robotics research and application
Subjects:

Table of contents

Automation and robotics the interdependence of design and construction systems

M Cusack

Examines the potential for introducing automation processes includingrobots into the construction industry. Outlines some of the problems to betackled including the technical and…

888

ABB focus on “lean robotization”

Jack Hollingum

Outlines ABB Robotics new manufacturing philosophy of “leanrobotization” based on early partnership between customer and supplierand a detailed knowledge of the customers…

263

Crane automation

C J Backhouse, R A Price, P R Moore

Looks at research work into crane automation for the constructionindustry. Describes the six major areas of the project: analysis ofexisting crane structures and mechanisms, the…

440

Automation in construction software systems lay the foundations

Mervyn Richards

Considers that computer models of construction projects are required asa precursor to automation of the construction process. Examines the problemof building computer models for…

318

Curio NDT robot for the construction industry

D A Chamberlain, G J Bleakley

Examines a prototype robot which is being developed to carry outnon‐destructive inspection maintenance and repair [IMR] ofbuildings and structures. Describes some of the areas…

198

Enabling technology for a masonry building advanced robot

D A Chamberlain

Examines a research program into the use of automation and robotics inmasonry building. The four main objectives of the project were to establishthe requirements for the…

229
Cover of Industrial Robot

ISSN:

0143-991x

Online date, start – end:

1973

Copyright Holder:

Emerald Publishing Limited

Open Access:

hybrid

Editor:

  • Dr Dimitrios Chrysostomou