Prelims

Chinese Railways in the Era of High-Speed

ISBN: 978-1-78441-985-1, eISBN: 978-1-78441-984-4

Publication date: 7 October 2015

Citation

(2015), "Prelims", Chen, Z. and Haynes, K.E. (Ed.) Chinese Railways in the Era of High-Speed, Emerald Group Publishing Limited, Leeds, pp. i-xxii. https://doi.org/10.1108/978-1-78441-985-120151011

Publisher

:

Emerald Group Publishing Limited

Copyright © 2015 Emerald Group Publishing Limited


Half Title Page

Chinese Railways in the Era of High-Speed

Title Page

Chinese Railways in the Era of High-Speed

ZHENHUA CHEN

University of Southern California, Los Angeles, CA, USA

KINGSLEY E. HAYNES

George Mason University, Fairfax, VA, USA

United Kingdom • North America • Japan • India • Malaysia • China

Copyright Page

Emerald Group Publishing Limited

Howard House, Wagon Lane, Bingley BD16 1WA, UK

First edition 2015

Copyright © 2015 Emerald Group Publishing Limited

Reprints and permissions service

Contact:

No part of this book may be reproduced, stored in a retrieval system, transmitted in any form or by any means electronic, mechanical, photocopying, recording or otherwise without either the prior written permission of the publisher or a licence permitting restricted copying issued in the UK by The Copyright Licensing Agency and in the USA by The Copyright Clearance Center. Any opinions expressed in the chapters are those of the authors. Whilst Emerald makes every effort to ensure the quality and accuracy of its content, Emerald makes no representation implied or otherwise, as to the chapters’ suitability and application and disclaims any warranties, express or implied, to their use.

British Library Cataloguing in Publication Data

A catalogue record for this book is available from the British Library

ISBN: 978-1-78441-985-1 (Print)

ISBN: 978-1-78441-984-4 (Online)

List of Tables

Chapter 1 1.1 Six speed-up strategies implemented in the Chinese railway system.
1.2 Average travel distance per personal trip by mode.
1.3 Freight railway transport characteristics by commodity: 2012.
1.4 Average transport distance per cargo trip by mode.
1.5 International comparison of railway service.
1.6 HSR infrastructure delivery schedule of different systems.
Chapter 2 2.1 Comparisons of the HSR operational performance (2012).
2.2 HSR evolution in the world.
2.3 Accident rate comparison among different modes of transport in China: 1996–2012.
Chapter 3 3.1 Comparisons of HSR deployment in different countries.
3.2 Chinese indigenous EMU technologies.
3.3 Tenders for EMUs during 2004 and 2006.
3.4 CRH EMU technological specifications.
3.5 Initial stakeholders of the Beijing-Shanghai HSR Co. Ltd.
3.6 Construction characteristics of the selected Chinese HSR lines.
3.7 Accommodation capacity of the top 10 Chinese rail stations.
3.8 Top 10 railway tunnels in China.
3.9 Summaries of HSR agreements initiated by Chinese top leaders.
Chapter 4 4.1 Regional economic disparity of the different economic zones (2004).
4.2 Top 10 major megalopolises in China.
4.3 Group clashes related to HSR construction.
4.4 Comparison of unit ticket price among different intercity transport services.
4.5 Major HSR failure statistics (December 2009–December 2014).
4.6 Financial performance and balance sheet of the Chinese railway corporation.
4.7 Comparison of air traffic before and after HSR service operations.
Chapter 5 5.1 Financial performance of different divisions of the SNCF (2013).
5.2 Impacts of major legislations on the U.S. railroads.
Chapter 6 6.1 SWOT analysis of different restructuring plans.
6.2 Implemented policies that aim to promote rail marketization.

List of Figures

Chapter 1 1.1 Evolution of the Chinese railway mileage: 1963–2012.
1.2 Modal share of passenger transport measured in ridership: 1963–2012.
1.3 Modal share of passenger transport measured in passenger-distance: 1963–2012.
1.4 Evolution of passenger rolling stocks: 1978–2013.
1.5 Passenger volume by the top 20 railway stations: 2012.
1.6 Passenger volume by the top 20 railway corridors: 2012.
1.7 Modal share of freight transport measured in tonnage: 1963–2012.
1.8 Modal share of freight transport measured in weight-distance: 1963–2012.
1.9 Evolution of freight railway rolling stocks: 1978–2012.
1.10 Freight volume by the top 20 railway stations: 2012.
1.11 Freight volume by the top 20 railway corridors: 2012.
1.12 Change of railway employment and labor productivity.
1.13 Research analytical framework.
Chapter 2 2.1 Transportation usage for business trip in China.
2.2 Frequency comparison of HSR versus conventional train.
2.3 Evolution of HSR in the world.
2.4 Evolution of passenger railway demand in China: 1949–2012.
2.5 Evolution of freight railway demand in China: 1949–2012.
2.6 Passenger railway demand during the golden week of the national day.
2.7 National daily passenger traffic during the 40 days of Chunyun.
2.8 Travel flows before and after the Chinese new year.
2.9 The four vertical and four horizontal HSR network in China.
2.10 China’s “One Belt and One Road” strategy.
Chapter 3 3.1 Organizational structure of EMUs R&D and manufacture in China.
3.2 A CHRH380A EMU leaves Beijing to Shanghai on a passenger dedicated line.
3.3 Capital expenditure on Chinese rail infrastructure.
3.4 Domestic bank loans adopted for railway infrastructure construction.
3.5 Variation of the Chinese railway bond: 1995–2014.
3.6 Foreign loans for the Chinese railway construction (2013).
3.7 Modern railway stations in China. (a) Zhengzhou East Rail Station. (b) Shijiazhuang East Rail Station. (c) Beijing South Rail Station. (d) New Wuhan Rail Station.
3.8 Dashengguan HSR bridge across the Yangtse river in Nanjing.
3.9 An EMU travels on the Lanzhou-Urumqi high-speed passenger dedicated line.
3.10 Tianxingzhou rail and road bridge across the Yangtse river in Wuhan.
3.11 A test run of CRH380B EMU on the Wuhan-Guangzhou high-speed passenger dedicated line.
3.12 A CRH380A runs out of a tunnel on the Zhengzhou-Xi’an high-speed passenger dedicated line.
3.13 Foreign exchange reserve and inflation rate in China.
Chapter 4 4.1 HSR and regional agglomerations.
4.2 HSR overpasses residential neighborhood.
4.3 Statistics of the Chinese railway debt maturity.
4.4 Organizational structure of the former MOR.
4.5 Top 10 manufacturers of rolling stock ranked by revenue in 2013.
Chapter 5 5.1 JNR organizational restructuring.
5.2 Restructuring of the British railway in 1996/1997.
5.3 Death in the UK railway accidents 1993–2014.
5.4 Evolutions of French railway organizations and institutions.
5.5 Evolutions of German railway organizations and institutions.
5.6 U.S. freight railroad performance since Deregulation.
Chapter 6 6.1 Evolutions of the Chinese railway freight rate.
6.2 A cartoon illustrating the unusual arrangement of free water distribution during a HSR service.
6.3 Classification of public and private welfare activity.

Glossary of Abbreviations

AAG Association of American Geographers
AAGR Annual Average Growth Rate
Amtrak National Passenger Railroad Corporation (the United States)
APEC Asia-Pacific Economic Cooperation
ARAF Autorité de Régulation des Activités Ferroviaires (Regulatory Authority of Railway Activities)
ASEAN Association of Southeast Asian Nations
ATP Automatic train Protection
BDI Bundesverband der deutschen Industrie (Federal Association of German Industries)
BEV Bundeseisenbahnvermögen (German Federal Railway Asset)
BJTU Beijing Jiaotong University
BOSWASH Boston-Washington
BRICS Brazil, Russia, India, China, and South Africa
BSchwAG Bundesschienenwegeausbaugesetz (German Federal Rail Network Extension Act)
BST Bombardier Sifang (Qingdao) Transportation Ltd.
CARS Chinese Academy of Railway Sciences
CCTV China Central Television
CEO Chief Executive Officer
CNR China Northern Locomotive & Rolling Stock Corporation
Conrail Consolidated Rail Corporation (the United States)
CPC Communist Party of China
CPI Consumer Price Index
CPPCC Chinese People’s Political Consultative Conference
CRC China Railway Corporation
CRCC China Railway Construction Corporation
CRH China Railway High-Speed
CRIC China Railway Investment Corporation
CRRC China Railway Rolling Stock Corp
CRSC China Railway Signal and Communication Corporation
CRTS China Railway Track System
CSR China South Locomotive & Rolling Stock Corporation
CTCS Chinese Train Control System
DB Deutsche Bundesbahn (German Federal Railway)
BD AG Deutsche Bahn Aktiengesellschaft (German Rail Joint Stock Company)
DCF Direction de la Circulation Ferroviaire (Rail Traffic Control Branch)
DIHK German Association of Chamber of Commerce for Trade and Industry
DM Deutsche Mark (German Mark)
DPA Department of Political Affairs
DR Deutsche Reichsbahn (German Imperial Railway)
DRG Deutsche Reichsbahn-Gesellschaft (German Imperial Railway Company)
EBA Eisenbahn Bundesamt (German Federal Railway Authority)
EBITDA Earnings before Interest, Taxes, Depreciation, and Amortization
EMU Electric Multiple Unit
EPIC State-Owned Industrial and Commercial Enterprise (France)
EU European Union
GDP Gross Domestic Product
GMU George Mason University
GSM-R Global System for Mobile Communications-Railway
HMRI Her Majesty’s Rail Inspectorate (the United Kingdom)
HSE Health and Safety Executive (the United Kingdom)
HSR High-Speed Rail
ICC Interstate Commerce Commission
ICE Intercity-Express (Germany)
ID Identification
IHRA The International High-Speed Rail Association (Japan)
IPO Initial Public Offering
JNR Japanese National Railways
JNRSC Japan National Railway Settlement Corporation
JR Japan Railways
kWh Kilowatt-Hour
LGV Ligne à Grande Vitesse (High-Speed Line)
LTL Less-than-Truckload Shipping
MTN Medium-Term Note
MOR Ministry of Railways
MOU Memorandums of Understanding
NDRC National Development and Reform Commission (China)
NIMBY Not in My Back Yard
NRA National Railway Administration (China)
OECD Organization for Economic Co-operation and Development
OECF Overseas Economic Cooperation Fund
OPRAF Office of Passenger Rail Franchising (the United Kingdom)
ORR Office of the Rail Regulator (the United Kingdom)
P3 Public-Private Partnership
PBKA Paris-Brussels-Cologne-Amsterdam
PDL Passenger Dedicated Line
PM Prime Minister
PRC The People’s Republic of China
RSAI Regional Science Association International
RCF Railway Construction Fund (China)
R&D Research and Development
RFF Réseau Ferré de France (French Rail Network)
RKB Regierungskommission Bundesbahn (German Governmental Railway Commission)
ROSCO Rolling Stock Operating Company (the United Kingdom)
RPC Rail Passengers Council (the United Kingdom)
SCP Short-Term Commercial Paper
SDA Special Debt Account (France)
SNCF Société Nationale des Chemins de fer Français (French National Railway Company)
STFB Short-Term Financing Bond
SWJTU Southwest Jiaotong University
SWOT Strengths, Weaknesses, Opportunities, and Threats
TBM Tunnel Boring Machine
TER Transport Express Régional (France)
TGV Train à Grande Vitesse (High-Speed Train)
TOC Train Operating Company
UIC International Union of Railways
UNESCO United Nations Educational, Scientific and Cultural Organization
USDOT United States Department of Transportation
USRA United States Railway Association
USC University of Southern California
3Rs Act The Regional Rail Reorganization Act
4Rs Act The Railroad Revitalization and Regulatory Reform Act

Preface

The development of the Chinese high-speed railway (HSR) system took place on a scale beyond anything the world has seen to date. Since 2004, the network was built at an unprecedented pace. After a decade of steady investment and construction, the trunk lines of the national HSR passenger system have been completed. Chinese railways have evolved into an era of high-speed. This enormous system, which includes a total track length of more than 12,000 kilometers, 425 newly built HSR stations, and more than 1000 HSR train sets, is regarded as a global miracle in infrastructure deployment. The system covers a service area of more than 28 provinces and links more than 28 metropolitan cities, each with a population of over five million. Travel time by railway has been dramatically reduced to such an extent that traveling a distance of a thousand kilometers — for example, between Beijing and Shanghai — takes only 4–5 hours.

The establishment of the new HSR system not only reshaped the Chinese people’s impression of railway travel, it also fundamentally transformed their travel behavior. For many years, travel by railway in China on long-distance trips was regarded as a horrible experience, especially during peak travel seasons. Previously, during these peak periods, a regular coach with a maximum capacity of 120 people was usually crammed with more than 250 people, together with their luggage. Moving inside these overcrowded passenger trains, including getting to the restroom, was almost impossible. A trip that would normally have a travel time of around 15 hours often took up to 45 hours during peak travel seasons, due to the train’s speed being reduced for safety concerns. All of these negative experiences of railway travel have radically changed since the debut of HSR service. The development of HSR also reshaped people’s mind-set regarding time and distance. In the new era of high-speed, the travel time between the two metropolitan cities Guangzhou and Wuhan, with a distance of 1070 kilometers, is only around 3 hours by high-speed train, whereas it would take at least 8 hours on a train traveling at normal speeds. The reduction of railway travel time accelerates competitiveness in the intercity transport market. For example, after the operation of the Guangzhou-Changsha HSR began in 2011, the daily number of flights between Guangzhou and Changsha decreased from 16 to 4. 1 The implications of HSR on both freight and passenger transport are revolutionary, given its potential influence on the improved efficiency of the entire transport system, on energy consumption, and on environmental impact, as well as on socioeconomic welfare.

The evolution of the Chinese HSR has amazed the world, in terms of both the speedy deployment of its infrastructure and the effective utilization of the new technology. The experience of HSR development in China continues to attract an immense amount of attention from many countries, including Russia, Thailand, Brazil, Saudi Arabia, and the United States, which are interested in the HSR system and eager to replicate the Chinese miracle of fast deployment in their countries. Conversely, the world is also very cautious about the Chinese experience, given concerns about its system reliability and the efficiency of project completion. In fact, the technological innovations of the Chinese HSR system remain ambiguous and arguable to the international community, given that China used a different strategy to develop HSR technology (by absorbing, assimilating, and revising) than other countries, such as Japan, France, and Germany, which primarily developed their HSR technologies through independent research and development (R&D).

Although the completed HSR system has begun to benefit China’s society and economy by enabling rapid travel connections among cities, the fast pace of HSR technology deployment has outstripped the capacity of institutions and organizations to effectively manage it. As a consequence, system reliability and operational safety were unavoidably affected. On July 23, 2011, a catastrophic HSR accident happened when two high-speed trains collided on a viaduct in the suburbs of Wenzhou in Zhejiang province. The accident, which killed more than 40 people and injured 192, shocked the world and exposed deficiencies in the structure of former bureaucratic railway institutions. The turmoil was exacerbated by the disclosure of a series of scandals involving former railway officials. Passion for HSR development was dampened by a loss of confidence in system reliability and the investment merit of HSR. A retrospective looking back at emerging system-wide challenges has become necessary. Despite China’s achievement in establishing a gigantic infrastructure network, critical questions remain unanswered concerning its HSR system. Does the deployment of HSR promote regional and social equity? Is the system sustainable with respect to economics, finance, operations, and societal impact? What are the emerging institutional challenges, and how should these challenges be appropriately addressed?

The answers to these questions, as well as evaluations of the effectiveness of Chinese HSR deployment, require an understanding of the issues that exist in the market, in operations, and in railway institutions. Railway service in China primarily is operated and managed by national agencies in a monopolistic market. The government plays dual roles, as both a market participant and a market regulator. The inefficiency of the railway transport market not only harms public welfare and causes public dissatisfaction, but also creates a negative ripple effect on the domestic transport system. Issues exist with railway operations as well. On the passenger side, the ticket reservation system has received enormous amounts of public criticism, due to the lack of transparency in the ticket distribution process, especially during peak travel seasons. On the freight side, the inefficient railway dispatching system, as well as redundant regulatory policies, severely reduces the competitiveness of freight rail services. Institutional defects in the railway system are another challenging issue. During the last half century, the former Ministry of Railways (MOR) was widely regarded as the “the last fortress of the planned economy” in China. This meant the institution gave an inadequate response to high cost overruns, had poor internal supervision, and had powerful internal operational silos, resulting in little external review and culminating in a major accident on the primary high-speed line in 2011. Although institutional systems were significantly reorganized in 2013, with the separation of operational and regulatory duties, issues such as lack of system transparency, lack of competition, and insufficient supervision remain.

How should these institutional problems with the Chinese railway system be addressed? One logical approach is to seek solutions from the best practices of railway reforms in other countries, especially those involving an HSR system. In fact, quite a few developed countries have become exemplary in instituting railway reform. The privatization of the railway in Japan in the 1980s demonstrates one way to manage a financial crisis with public railway debt, caused by massive HSR investment. The railway franchising case in the United Kingdom provides another case of introducing competition into the railway sector; the UK’s experience may be helpful to the existing Chinese railway system, in terms of organizational restructuring. The French and German railway reforms offer other examples of integrating railway operations and management concerns in both regular rail and HSR services. The United States doesn’t possess a true HSR system, but its freight rail system is recognized as the most efficient in the world and may provide an appropriate context for Chinese decision makers to explore strategies in deregulating Chinese freight railways.

Last but not least, determination is the key to achieving effective operations in the Chinese railway system. Commitment to continuing institutional reform is fundamental, but it also requires more involvement from a wider array of stake holders. Strong leadership is essential but is not sufficient in itself. A transparent institutional structure is crucial but requires more public participation in the process of institutional restructuring.

The development of HSR has expanded the capacity of railway infrastructure to support the fast-growing Chinese economy. However, the high-speed infrastructure deployment also created institutional and organizational challenges, because the old railway organizations have proved to be unsuitable in managing such an innovative and complex system. This book was written with two objectives. The first is to introduce the Chinese railway system and document the evolutionary process of railway development in China. For the first time, a comprehensive view is being presented to an international audience to help clarify the Chinese experience with HSR deployment, including the economic and physical achievements and related managerial issues and institutional challenges. The second objective is to discuss and analyze critical concerns regarding Chinese railway operations, management, and institutional structure. Through an analysis of the best practices of railway reform and considerations of how to improve China’s institutions, based on experiences in other countries, policy implications for the Chinese railway system, as well as concerns about reform strategies, are raised and discussed. The goal is to improve the capability and capacity of institutions and organizations as necessary, in order to achieve sustainable development.

Railway industrial managers and researchers interested in understanding the deployment of Chinese HSR will find this book useful. Scholars, faculties, and graduate and undergraduate students who specialize in transportation planning and policy, social policy, and Asian studies may also find this book helpful, in terms of understanding the Chinese transportation system.

Zhenhua Chen and Kingsley E. Haynes

Note

1

Data are obtained from media report at: http://www.ycwb.com/epaper/ycwb/html/2011-03/31/content_1075872.htm. Accessed on September 27, 2014.